Archer City Water Treatment Plant

WTP

Rebuilding Trust Through Infrastructure

 
 

Problem Statement

For years, the residents of Archer City endured mounting concerns over their aging water infrastructure. News outlets routinely reported on the deteriorating conditions—frequent service disruptions, inconsistent water quality, and rising maintenance costs. The city’s existing treatment system, once adequate, had become obsolete in the face of growing population demands and stricter water quality regulations. City officials, engineers, and community stakeholders agreed: it was time for a comprehensive solution. The consensus was clear—Archer City needed a modern water treatment plant that could restore public confidence and meet the community’s needs for decades to come.

 

Proposed Solution

MH Civil Constructors, Inc. was selected to lead the charge, chosen for their track record of delivering complex infrastructure projects on time and with precision. The team constructed a 1.0 MGD water treatment plant tailored to the city’s future demands. The project involved a full suite of upgrades—from ground-up construction to advanced filtration systems—all designed for maximum operational efficiency and regulatory compliance.

Construction began with strategic site development to ensure long-term stability and ease of access. Major components included a new administration building for facility oversight, a Parshall flume structure for precise flow measurement, and two clarifiers to enhance sedimentation processes. A state-of-the-art filter building was erected, housing high-performance filtration equipment, valves, and piping systems. Chemical treatment capabilities were bolstered through a dedicated building equipped with precision feed systems. Supporting infrastructure, including ground storage tanks and a high service pump station, rounded out the design—ensuring both capacity and reliability.

MH Civil’s execution strategy emphasized meticulous planning, daily coordination meetings, and proactive issue resolution. The team’s approach kept the project tightly controlled, with change orders totaling less than 1% of the original contract value—an exceptional outcome for a project of this scale.

 

Outcome

The result was transformative. The new Archer City Water Treatment Plant expanded the city's treatment capacity to 1.0 MGD, marking a significant increase in both volume and reliability. Residents quickly noticed the improvements: water quality stabilized, and service disruptions all but disappeared. Regulatory compliance was not only achieved but exceeded, thanks to the advanced filtration and chemical systems integrated into the design.

Operational efficiency also saw a sharp improvement. By replacing outdated systems with energy-efficient equipment, the city realized an estimated 25% reduction in energy usage—a cost-saving measure that also aligned with long-term sustainability goals. Just as importantly, the project was completed ahead of schedule, allowing the city to start reaping the benefits sooner than expected.

Perhaps the most valuable outcome, however, was the restoration of public trust. Throughout the project, MH Civil Constructors maintained transparent communication with city leaders, engineers, and citizens. Regular updates via council meetings and local media outlets kept everyone informed, creating a sense of shared ownership in the project’s success.

One of the key takeaways from the Archer City project was the value of proactive stakeholder engagement. Early and consistent communication helped align expectations, minimize scope creep, and secure community support. Additionally, the project underscored the importance of investing in quality up front—through both design and materials—to avoid long-term maintenance headaches and ensure regulatory durability.

In the end, the Archer City Water Treatment Plant wasn’t just a civil works project—it was a vital public investment, built on trust, expertise, and a commitment to doing things right the first time.